Results from Amur’s twin 2015 field season in-fill and step-out drilling programmes at Flangovy have successfully confirmed the continuity of mineralisation with respect to contained metal and thickness over a length of 1,200m, making the promotion of up to 27.4Mt of inferred resources into the indicated category a distinct likelihood when the final results are received in December. The fact that the (length-weighted) average grade of nickel mineralisation was 0.83% (cf a resource grade of 0.56%) and that nearly 83% of nickel metal is observed to be contained in continuous high-grade lenses with an average grade of 1.04% Ni also suggests that the project has the potential to be materially reconfigured to the upside.

Continue reading

This version is programmatically created by Responsive Labs and qualified in its entirety to the original PDF.